Tuesday, February 20, 2018

October, 2017, Midwest Haunted Rails

This post covers the four weekends in October that we hosted Midwest Haunted Rails: October 6-7, 13-14, 20-27, and 27-28. The boiler wash occurred on October 29.

Disappointing weather caused the truncating of one night's operation and the cancellation of another night's entire event. The dampened enthusiasm also caused a shortage of pictures but Joanie M. came to the rescue with a large group of pictures covering trains in motion, people, and other "things."

10/06

Some interesting views of the trains passing with the ominous sky in the background.






Brakeman Kendall O. hanging off the rear platform of a caboose.



The staff readies the two locomotives. A quick swap of the 6's headlight was in order. During the Old Threshers Reunion, we had mounted the 2's proposed headlight on the 6, but there is a limited amount night time running at OTR. Most of Haunted Rails is at night and a 100% reliable headlight is a must. Until the 2nd weekend, the temporary installation was not 100% reliable.




Looking backward from inside a caboose.



Various pictures of our staff on duty.









It is unknown exactly who Ken C. made friends with this night.




10/20

Matt C. supervises Brian B's firing of the 6.


Getting ready for the night's running.


An enthusiastic newly promoted fireman, Matt W. cheerfully dances over some air hoses on his way towards the locomotive. 




10/21 

The brakeman refused to dismount from the 6's pilot causing us to work around him for the rest of the evening.



Kendall O's pup refuses to move. He's been told to not bring his pets to the railroad. 


10/29 

Boiler washing. 

No. 6 was put away for the winter. No. 12 received its end-of-event cleanup in anticipation of the 2017 North Pole Express.


   
After draining, the boiler is pressurized by the portable diesel air compressor. The compressed air is used to dry the steam lines and appliances.

The following video shows the locomotive being moves back and forth on compressed air. Notice how much water vapor is vented from the cylinder cocks.




From this point on, the pictures depict out-of-ordinary situations on and in the railroad. The pictures are a mixture of people in costume and props.


























-Steam.airman

September, 2017, Work Weekend

The September work weekend became two weekends. Besides Saturday, September 16th, it included following Saturday, September 23rd.

Midwest Haunted Rails was extended to four weekends in 2016. With the first 2017 MHR weekend fast approaching the additional work weekend gave volunteers additional opportunities to convert the South Station from a mundane rail car storage area to the famous "spook house."

Those present also participated in a potluck lunch.

-Steam.airman

August-September 2017 Old Threshers' Reunion

This post covers the 2017 Old Threshers Reunion, starting a week before and ending the day after the Reunion.

08/24

The August, 2017, work weekend post had a few pictures of the MCRR volunteers replacing ties on the spur on the east side of the South Station. The tie replacing project was in conjunction with the anticipated south spur switch rebuilding project. The next few pictures show the professional staff of Diversified Track Works rebuilding the switch.




A random shot north from the shop. A good portion of our rolling stock is outside so we could gain complete access to the South Station and Museum B. That is the 6 in the foreground without its tender and the 16 anxiously awaiting attention so it can get back into service.



Scott D. attends to the track signals.




"FS-2," "Snare 2," "Squirt" -- whatever we are calling it that second -- pulls the 6's tender from the shop to the hydrant in front of the South Station. The tank's access panels had been removed, the inside prepared, and a waterproof coating applied to the inside walls. With the panels replaced, it was time to fill the tender and check for leaks.

It would be generous to state there were a few leaks. The fasteners holding the access panels in place proved extremely problematic and one of the two feedwater valves sheared off due to corrosion.



Nelson S. and Matt W. monitor the filling of the tender. Later Elliot H. attends to some of the leakey fasteners.




08/26

Alan P. and Dale P. embark of a week long project of getting No. 6 ready for the Reunion.





Started some time ago, the updating of the "green coach" was nearing completion. A much needed coat of paint was applied converting the "green coach" into the "maroon coach."






No. 6's tender was mated to the locomotive. Rex F. and Jesse V. connect the right side feed water line to the tender.




08/27

Paul K., Lee R., and Matt W. fabricate a linkage arm for one of the 6's whistles.





The ready-to-use "maroon coach" after the masking on the windows and doors was removed.



No. 12's turn at the water station. Part of the 2017 season setup is to perform a hydrostatic pressure test of the boiler. First step is to top up the boiler.



With the boiler full, a pressure pump is attached and the pressure is increased to beyond its normal operating value. If no leaks are detected, an excited volunteer enters the firebox to tap on the staybolts to determine if any have cracked in the previous season's use.





08/29

Dale P. continues the preparation of No. 6.



No. 12 gets its waste cellers serviced. Rex F. contemplates doing something other than the waste cellers.




08/30

No. 12's left side feed water system had a water inlet valve fail causing the Sellers 7 1/2 Class N lifting injector to stop injecting. The valve was replaced and Jesse V. restored a portion of the injector's innards to proper working condition.




The converted flatcar (see the July, 2017 blog "DRGW Flatcar 6206 Enters Passenger Service") needed a way to board passengers. John K. fabricates a ramp to join the flatcar to an accompanying coach.



After the ramp was completed, the two units were towed by No. 14 around the tracks to insure there would not be any operational problems with the refurbished coach, the converted flatcar, or the connecting ramp.



No. 6 is ready for fire-up.



08/31

Nos. 6 and 12 getting warmed up for the first day of the Reunion.








09/01

No. 6 leaves the yard on its way to get its consist for the day.



09/02

No. 12, with Dustin B. at the controls, leaves the yard.






No. 6 running light.



09/05

All done. The two locomotives get an end of event clean-up. Elliot H. washes the fire side of No. 12's flues.



-Steam.airman