Friday, May 28, 2010

May 2010 Post Work Weekend Special - I

After the first coat of primer was applied to the boiler, a second coat was added. Pictures are available, but it is nearly impossible to tell anything changed.

A few after the second coat was applied, Griffin W and Dallas K, along with several other volunteers (unknown as of this writing) placed the boiler on the chassis officially marking the reassembly of the 6.




























Dallas inspects the smoke box end of the boiler as it rests on the steam saddle. Some sort of elixir was applied to the saddle to seal any possible steam or smoke leaks.














Griffin mixes the elixir.














-steam.airman;
-pictures courtesy BrianB.