From The Shop at the MCRR
Saturday, December 20, 2008
December 2008
With all events finished for the year work turn to cleaning and winterizing the engines and
maintenance
.
Dec. 20
th
2008
Flurries
and 23 deg
Eng. #9 gets its boiler wash
Griffin W. flushes the #9's
mud ring
out.
Cold work......
Engine #6 has been stripped in
preparation
for boiler work.
Merry Christmas !
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)